Home ProductsDrilling machine for underground and for water

ZYJ-380/210 HYDRAULIC FLAMEPROOFED UNDERGROUND EXPLORATION DRILLING RIG WITH POST

ZYJ-380/210 HYDRAULIC FLAMEPROOFED UNDERGROUND EXPLORATION DRILLING RIG WITH POST

    • ZYJ-380/210 HYDRAULIC FLAMEPROOFED UNDERGROUND  EXPLORATION DRILLING RIG WITH POST
    • ZYJ-380/210 HYDRAULIC FLAMEPROOFED UNDERGROUND  EXPLORATION DRILLING RIG WITH POST
    • ZYJ-380/210 HYDRAULIC FLAMEPROOFED UNDERGROUND  EXPLORATION DRILLING RIG WITH POST
    • ZYJ-380/210 HYDRAULIC FLAMEPROOFED UNDERGROUND  EXPLORATION DRILLING RIG WITH POST
  • ZYJ-380/210 HYDRAULIC FLAMEPROOFED UNDERGROUND  EXPLORATION DRILLING RIG WITH POST

    Product Details:

    Place of Origin: CHINA
    Brand Name: SHIMEI
    Certification: MA, DGMS
    Model Number: ZYJ-380/210 Hydraulic drilling machine for water exploration

    Payment & Shipping Terms:

    Minimum Order Quantity: 1
    Price: USD7200 PER UNIT
    Packaging Details: polywooden case
    Delivery Time: 10 DAYS
    Supply Ability: 1000 UNTS PER MONTH
    Contact Now
    Detailed Product Description
    Usage: Exporation And Blasting Hole Drilling In The Underground Of Coal Mine Small Weight: Only 140kgs
    Three Parts: Easy To Install And Move To Other Place Feature: With A Post To Improve The Stability
    Model: ZYJ-380/210

    ZYJ-380/210 HYDRAULIC FLAMEPROOFED UNDERGROUND EXPLORATION DRILLING RIG WITH POST

    ZYJ-380/210 HYDRAULIC FLAMEPROOFED UNDERGROUND  EXPLORATION DRILLING RIG WITH POST

    ZYJ-380/210 HYDRAULIC FLAMEPROOFED UNDERGROUND  EXPLORATION DRILLING RIG WITH POST

    1.The drilling rig is made of three parts, propelling and supporting part, power pack, control panel.
    2.It is mainly be used for the exploration hole drilling , gas realease, water or coal detection. Due to the crane can be adjusted around the post, it also can be used for the bolting hole in the roof, rib and floor.
    3.It is easy to be installed.
    4.The drilling rig can be used in the coal mine as well as other mines for it can use alloy drilling bits as well as diamond drilling bits. At the same time, the drilling pipe can be pass through water or mud.
    5.The drilling rig can also be mounted on the side of the roadheader, in this way the drilling and cutting can be made simultaneously.

    6. The post can be tightly fixed in the roadway through the lifting oil cylinder of the post, and the stability of the drilling rig in the drilling process is enhanced by the bracket. and the safety performance is improved. The track of the propeller makes a structure with the post and the propeller makes a reciprocating actions along the slide rail by multi-stage cylinder. cycloid hydraulic motor under the action of the high pressure oil drives the drilling rod and drilling bit to make the drilling through the rotating device of the output shaft.

    7. The double gear pump is used to control the normal operation of the components for the power pack. In order to ensure the cleanness of the oil, air filter is used for adding the hydraulic oil and the oil filter to suck out the hydraulic oil.

    8. The operating panel is composed of a three valve, and the oil from the power pack is conveyed to the control valve through a rubber hose and then is distributed to the hydraulic system of the drilling rig.

    The operating panel is provided with a speed regulating valve, an overflow valve, a hydraulic control one-way valve, a hydraulic lock, etc., so as to ensure the safe operation of the whole system. The drilling rig can connected with the air or water to cool the system or discharge the slag.

     

    Shijiazhuang Coal Mining Machinery Co., Ltd.

    167 Yuxiang Street, Shijiazhuang, China.

     

    Contacting person: Gina

    Tel: +86 311 85538986

    Fax: +86 311 85538888

    ginazi@163.com

    Website: www.coalcutting.com

     

    Specification

    Drilling

    rig

     

    Description Unit Parameters

    Nominal pressure

    Mpa 16

    Nominal torque

    N.m 380

    Nominal rotation speed

    rpm 210

    Nominal flow rate

    L/min 70

    Propelling force ( I stage)

    KN 20

    Propelling force ( II stage)

    KN 10

    Returning speed

    Mm/min 9000

    Propelling stroke

    mm 1080

    Guiding rack length

    mm 1910

    Max. working height

    mm 4000

    Min. working height

    mm 500

    Weight

    kg 230

    Propelling speed without load

    mm/min 5000

    Rinsing water pressure

    MPa 0.6-1.2

    Hole diameter

    mm Φ65-Φ94

    Drilling speed

    mm/min 210

     

    noise

    Noise pressure grade

    dB(A) 92

    Noise power grade

    dB(A) 108

    Power pack

    Nominal pressure

    MPa 17

    Nominal flow rate

    L/min 72

    Model of the motor

      YKB2-160l-2

    Nominal power

    kw 15

    Nominal voltage

    V 380/660

    Nominal current

    A 31.1/17.4

    Oil tank efficient capacity

    L 120

    Power pack dimensions

    mm 1370*460*790

    Power pack weight

    kg 223
    Operation panel

    Operation panel weight

    kg 50

    Overall dimensions

    mm 450*600*900